This type of manual keg washing machine have two types: Single keg station and double keg station, client can choose depending on the brewery capacity.
Main Technical Parameters
Equipment Outer Dimensions 1200*1500*1500 mm
Net Weight 200KG
Power Steam Heating: 3KW Electric Heating: 18KW
Production Capacity 60-80 kegs/H
Applicable Kegs Keg with Diameter 250-500mm, Height 360-600mm
Heating Way Electric Heating or Steam Heating
Washing Method Invert washing
Power Supply Voltage AC 380V 50HZ (customized)
Main function and feature
1、Manual operations, convenient and flexible.
2. Applicable for all kegs with keg spear.
3、With CO2 pressurization function.
4. Could product the single station or double station manual beer keg washing machine (user-selectable).
Working process
Fix the beer distributor--invert the keg on table board--Drain Residue--Water Rinse--Drain off—caustic washing--recycling--hot water rinse--Drain off--CO₂ pressurizing--take the bottles(cans)
All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304 All signs & wording in English All tanks to be supplied with Data Plates including Test Data & Serial Number All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar) All tanks will be pressure tested for 48hours before leaving the MICET factory; All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation All tanks are mirror polishing inside, to be Ra 0.4um. All Gaskets are manufactured with EPDM
T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.
The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in MICET account and technical drawings are signed & confirmed by the client The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time. Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.
To get professional quotations, please email to us or submit the following sheet, we will contact you in 24 hours and pls check your emailbox. Your connection information will just be known by ourselves.