The beer brewery is a two tank 3 vessel brew house brewing system, which is designed just for the American market, with grist hydrator, gearbox, grant, skid mounted platform, two pumps, multi-positioned butterfly valves, which is always Micet's highest standard for North American market. We are specialized in manufacturing different types of industrial breweries and microbreweries to different clients in the world. The full line products including milling, mashing, fermentation, cooling, filtration, filling and other related processes. We focus on each brewing system to stringent testing procedures before publishing them in the market.
Lauter tank equipped with plow knife (raker knife with scraping plate); Raker motor;
Top manhole: round glass manhole; Side grain outdoor with grain chute;
Easy-clean and detachable Sparging sprayring
Laser cutting T-wires false bottom (filter);
Filter way: Suction filtration by speed controlled pump;
Flat base, with wort collection tube and underflush system
Equipped with balance tank and grain out dustpan;
360° coverage CIP spraying ball;
Temperature measurement way: PT100
4 completely SUS304 heavy duty legs with leveling pads
Steam jacketed heating 2 zone
Kettle/whirlpool tank:
Material: SUS 304;
Inner-Jacket TH=:3.0mm; External-Jacket TH=2.0mm;
Insulation layer: Rock wool-thickness: 80mm;
Top manhole: round glass manhole 400mm;
360° coverage CIP spraying ball;
Temperature measurement way: PT100
4 completely SUS304 heavy duty legs with leveling pads
Heating way: Steam heating;
Steam vent by steam condenser with spray nozzles
Sanitary leveling sight glass at the back of kettle;
Tangential whirlpool inlet
Optional configuration:
Heat exchanger: hunging typeNuanbao Brand
Paltform: Normal standard or water leaking type
Pumps ABB or JLEM
All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304 All signs & wording in English All tanks to be supplied with Data Plates including Test Data & Serial Number All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar) All tanks will be pressure tested for 48hours before leaving the MICET factory; All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation All tanks are mirror polishing inside, to be Ra 0.4um. All Gaskets are manufactured with EPDM
T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.
The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in MICET account and technical drawings are signed & confirmed by the client The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time. Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.
To get professional quotations, please email to us or submit the following sheet, we will contact you in 24 hours and pls check your emailbox. Your connection information will just be known by ourselves.