Fermentation tanks is also called CCT (Cylindrical Conical Tank), FV (Fermentation Vessel), primary fermenter or unitank as they are used both for fermenting and sotage. Micet stainless steel fermenter can be individually temperature controlled through glycol jackets and are fully equipped with accessories such as pressure relief valve, CIP cleaning ball, sample valve, manhole,etc Fermenting is the process during which the yeast transforms the wort into beer. Bright beer takes place after fermenting and mainly function is to make the beer more clear and store a longer time.
60degree cone; 1 zone dimpled jacket on bottom and side;
Cooling media: glycol water or alcohol water.
Stringent jacket leakage test by water and pressured gas.
360°coverage CIP spraying ball for cleaning.
Full sanitary sample valve
PT100Temp. sensor for high accuracy temperature control;
100% TIG welded joints;
Mirror polishing to 0.4μm without dead corner.
Design pressure 0.4MPa; Working pressure 0.2Mpa
Side shadowless manway 530*430mm
Rotation racking arm;
Dry hops adding port
Complete valves, fittings and all parts
All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304 All signs & wording in English All tanks to be supplied with Data Plates including Test Data & Serial Number All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar) All tanks will be pressure tested for 48hours before leaving the MICET factory; All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation All tanks are mirror polishing inside, to be Ra 0.4um. All Gaskets are manufactured with EPDM
T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.
The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in MICET account and technical drawings are signed & confirmed by the client The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time. Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.
To get professional quotations, please email to us or submit the following sheet, we will contact you in 24 hours and pls check your emailbox. Your connection information will just be known by ourselves.