Double Stations Beer Keg Filling Machine for beer filling
Main Technical Parameters
Equipment Outer Dimensions 1000*850*1550mm
Net Weight 130KG
Power 60W
Production Capacity 60-80kegs/H
Filling Method Keg Topside up
Applicable Kegs Keg with Diameter 250-500mm, Height 360-600mm
Power Supply Voltage AC 220V 50HZ(customized)
Main function and feature
1、All procedures are thoroughly controlled by SIEMENS programmable controller. All parameters (time values) can be adjusted without stopping the machine.
2. Two filling stations with separate control systems.
3.Pressure maintaining system performance is stable and reliable, to make sure the lowest beer loss compared to other similar products.
4.Could fill the kegs with different volume directly, and do not need to adjust any parameter
Working process:
Fix the keg ---Start -- Co ₂ pressurization -Filling-- stop-- Take the keg
Two Stations Beer Keg Filling Machine with flow meter
Main Technical Parameters
Equipment Outer Dimensions 1000*850*1550mm
Net Weight 180KG
Production Capacity 60-80 kegs/Hr
Filling Method Keg topside up
Applicable Kegs Keg with Diameter 250-500mm, Height 360-600mm
Power Supply Voltage AC 220V 50HZ(customized)
Main function and feature
1.With flow meter, can control the filling amount precisely, not affected by the size of the keg.
2. All procedures are thoroughly controlled by SIEMENS programmable controller. All parameters (time values) can be adjusted and shown through touch screen without stopping the machine.
3. Germany import flow meter, accurate measurement, high precision.
4. Two filling stations with separate control systems,can fill kegs with different volume separately.
5. The LCD screen can display filling process synchronously, and also can count the quantity of kegs and the total filling volume.
Working process:
Fix the keg ---Start -- Co ₂ pressurization -Filling and counting-- stop-- Take the keg
All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304 All signs & wording in English All tanks to be supplied with Data Plates including Test Data & Serial Number All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar) All tanks will be pressure tested for 48hours before leaving the MICET factory; All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation All tanks are mirror polishing inside, to be Ra 0.4um. All Gaskets are manufactured with EPDM
T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.
The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in MICET account and technical drawings are signed & confirmed by the client The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time. Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.
To get professional quotations, please email to us or submit the following sheet, we will contact you in 24 hours and pls check your emailbox. Your connection information will just be known by ourselves.