Nano brewery is normally used for installation in microbreweries, restaurants, bars and hotels. A network of industrial systems uses brewery equipment with higher capacity. MICET microbreweries are installing at the customer's sites turn-key solution. To realize a less than 4bbl of beer per day is unprofitable, so the minimum performance of our equipment is 3bbl.
Specifications
Output/Brew 4bbl
Brew/Week 2~6
Output/Week 14~30bbl
3phase/380(220, 415,440…)v/50 (60)Hz
Electric Supply Single Phase/ 220(110, 240…)v
/50(60)Hz
Heating Source Direct fired heating
Area Request >30M2
Brewmaster 1
Configuration
1. Malt Milling Unit
2. 4bbl Brewhouse Unit
Mash tun/Lauter tun, Boiling/Whirlpool tun combination
Hot water tank and cold water tank for optional;
Infusion or decoction brewing methods are designed exactly
Stainless steel or copper cladding are popular
Two stages heat exchanger for wort cooling
Completely stainless steel skid mounted platform
Sanitary and efficiency wort pump
All pipings and fittings
3. 4bbl Stack Unitank Fermentation Unit
Standard stainless steel conical cylindrical fermentation tanks
Double size of brewhouse is common
Tanks quantity is exactly calculated by fermentation cycle for various beers
All manhole, valves, pressure gauges, fittings etc are included
Save space
4. Cooling Unit
Insulated glycol water tank for glycol liquid holding and mixing
Efficiency chillers or refrigerators with fryonto supply cooling energy
Sanitary centrifugal pump for glycol water recycle among tanks and heat exchanger
All pipes, fitting, insulation materials are included
5. Controlling Unit
Electrical controlling cabinet with temperature, on-off controlling for brewhouse
Electrical controlling cabinet with temperature, on-off controlling for cooling cellars
Temperature controller, thermocouple, solenoid valves etc are included
6. Beer Dispenser
Beer dispensing columns and faucets for directly beer service
Keg filling and washing machine
Manually bottling machines for self consumption
7. Other Facilities
Portable CIP system for cleaning the tanks
Steam boiler for brewhouse heating
Water treatment for brew water
Oil free air compressor
All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304 All signs & wording in English All tanks to be supplied with Data Plates including Test Data & Serial Number All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar) All tanks will be pressure tested for 48hours before leaving the MICET factory; All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation All tanks are mirror polishing inside, to be Ra 0.4um. All Gaskets are manufactured with EPDM
T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.
The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in MICET account and technical drawings are signed & confirmed by the client The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time. Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.
To get professional quotations, please email to us or submit the following sheet, we will contact you in 24 hours and pls check your emailbox. Your connection information will just be known by ourselves.